Re: Is New Orleans finished ?
- From: kensmith@xxxxxxxxxxxxxxx (Ken Smith)
- Date: Thu, 1 Sep 2005 14:01:34 +0000 (UTC)
In article <df5h8j0un1@xxxxxxxxxxxxxxx>,
Winfield Hill <Winfield_member@xxxxxxxxxxx> wrote:
[...]
> even tho the water was below its top. It's speculated that the levee's
> base failed. We need ways to test these issues. That's something the
> Dutch know a lot about, and we could learn from them.
GPR doesn't work well into wet soil but resistivity survey methods do. I
think resistivity would be the best way to see into the levees.
BTW: There was a plan to improve the levees and some of it was done but
this year the budget was cut to 20% of what was needed for the program.
--
--
kensmith@xxxxxxxxx forging knowledge
.
- References:
- Re: Is New Orleans finished ?
- From: bill . sloman
- Re: Is New Orleans finished ?
- From: Dirk Bruere at Neopax
- Re: Is New Orleans finished ?
- From: Winfield Hill
- Re: Is New Orleans finished ?
- Prev by Date: Re: VCO Phase noise: consequence for mixing...
- Next by Date: Re: Is New Orleans finished ?
- Previous by thread: Re: Is New Orleans finished ?
- Next by thread: Re: Is New Orleans finished ?
- Index(es):
Relevant Pages
|