Death by Communism



The UK is desperately trying to strangle itself by employing as many
people as possible to control as many people as possible.

I need to upgrade my domestic electrical supply to 100A but...

Controller "We cannot upgrade your 60A fuse to 100A unless the tails
are 25mm."
"But I am not allowed to do that."
Controller "Exactly, you need a qualified part-P electrician."
"But he can't wire up the extra load until the 100A fuse is fitted."
(sung to the tune "there's a hole in my bucket")
Controller "I'll send you out a load investigation form.You fill it in
and send it back."

I predict that the load investigation will report "The customer does
not have 25mm tails in place therefore he cannot have the 100A
upgrade." and then I will dial:

08701 963 090 and press "1" for "upgrade domestic supply" and the reply
will be

"you need to dial" 0845 234 0040 negotiate another menu or two, enjoy
several minutes of the second movement of BWV 1068 in D major before a
human being will tell me that "to upgrade domestic supply you need to
dial

08701 963 090 and then I will "hold for general enquiries" while they
play "There's a hole in my bucket." and then the Controller will say,
"We cannot upgrade your 60A fuse to 100A unless the tails are 25mm..."


Cheers
Robin

.



Relevant Pages

  • Re: W2003 as NT4 BDC?
    ... My new 2003 domain controller is a Compaq ML350. ... Eventually I will upgrade these to 2003 and at that time I guess I ... By default, the DNS installed itself on my new machine, and in the IP ... properties it pointed to itself as DNS server. ...
    (microsoft.public.windows.server.migration)
  • Re: Death by Communism
    ... I need to upgrade my domestic electrical supply to 100A but... ... Controller "We cannot upgrade your 60A fuse to 100A unless the tails ... you need a qualified part-P electrician." ...
    (sci.electronics.design)
  • Re: Death by Communism
    ... I need to upgrade my domestic electrical supply to 100A but... ... Controller "We cannot upgrade your 60A fuse to 100A unless the tails ... you need a qualified part-P electrician." ... I predict that the load investigation will report "The customer does ...
    (sci.electronics.design)
  • Re: Death by Communism
    ... I need to upgrade my domestic electrical supply to 100A but... ... Controller "We cannot upgrade your 60A fuse to 100A unless the tails ... you need a qualified part-P electrician." ... I predict that the load investigation will report "The customer does ...
    (sci.electronics.design)
  • Re: SP4 and Server 2000 BSOD
    ... Why upgrade the bios/drivers if they're working? ... Boot Device", then it's most likely failing on your array controller. ... > I uninstalled the network cards and Installed a SMC card and it blue ...
    (microsoft.public.win2000.networking)