Re: MANUFACTURING SOFTWARE



In article <6sZ6i.31388$Um6.9323@xxxxxxxxxxxxxxxxxxxxxxxxxx>,
notthisjoergsch@xxxxxxxxxxxxxxxxxxxxx says...
Michael A. Terrell wrote:

Joerg wrote:

Robert Latest wrote:


Joerg wrote:



My clients pretty much all do it the same way. No kitting. They send the
whole set of parts over, boards get stuffed and the balance of parts
comes back with the stuffed boards.


I thought kitting meant just that -- sending in all parts and getting the
assembled boards back? Or did I miss a pun?


In the US it usually means kitting with the exact number of parts
needed. I don't think that is efficient. So, in a production environment
I prefer handing the folks there some authority to pull what they think
they'll need. In the case of the ultrasound systems that allowed them to
keep spares in case something broke off, or pull less than required for
the whole month so more shop space remained available. One requirement
in medical is training in stock keeping because they could also return
stuff that wasn't needed back to the stock room.

With the circuit boards we just sent the whole stock of parts. Labor
cost for kitting: Zilch. Time delay due to kitting: Zilch.



That is OK if you don't have several hundered, to a thousand
different jobs in process at one time.


In those cases we still did it but the stock remained at the contract
assembler. Later the contract assembler gradually took over purchasing,
further reducing our overhead costs.

I've done that with the common parts. Often they'll have them in
stock waiting. I usually had to design around availability though.
These I bought before the design was complete to insure I had a
buildable design. Sometimes I had a better supply (could apply a
firmer twist to the arm) than the contract manufacturer. I never had
more than a couple of designs and variations in the mill and
quantities were small.

--
Keith
.



Relevant Pages

  • Re: MANUFACTURING SOFTWARE
    ... Michael A. Terrell wrote: ... comes back with the stuffed boards. ... I thought kitting meant just that -- sending in all parts and getting the ... stuff that wasn't needed back to the stock room. ...
    (sci.electronics.design)
  • Re: MANUFACTURING SOFTWARE
    ... I thought kitting meant just that -- sending in all parts and getting the ... stuff that wasn't needed back to the stock room. ... These I bought before the design was complete to insure I had a buildable design. ... Either a prototype or test fixture, where only a few are made, or production, where I had nothing to do with the manufacturing end. ...
    (sci.electronics.design)
  • Re: MANUFACTURING SOFTWARE
    ... comes back with the stuffed boards. ... I thought kitting meant just that -- sending in all parts and getting the ... stuff that wasn't needed back to the stock room. ... These I bought before the design was complete to insure I had a buildable design. ...
    (sci.electronics.design)
  • Re: MANUFACTURING SOFTWARE
    ... comes back with the stuffed boards. ... I thought kitting meant just that -- sending in all parts and getting the ... stuff that wasn't needed back to the stock room. ... I usually had to design around availability though. ...
    (sci.electronics.design)
  • Re: MANUFACTURING SOFTWARE
    ... comes back with the stuffed boards. ... I thought kitting meant just that -- sending in all parts and getting the ... stuff that wasn't needed back to the stock room. ... Later the contract assembler gradually took over purchasing, ...
    (sci.electronics.design)

Loading