Joerg wrote:

Most places I've seen operate in similar fashion. But you know how it
goes. The guy with the floor buffer comes along, dragging that big power
cable. Leroy wants to quickly finish up what the night shift didn't
quite get done, he's a bit tired by now, rolls the cart with the heavy
analyzer, oops ...


The maintenance man was a full time day shift employee, and wasn't
allowed to move any equipment if the tech wasn't at the bench. There was
no second or third shift, just some overtime for the day shift people.
Most of the carts had so many cables run to the bench that they had to
be unhooked to move more than a few inches. We were notified of any
building maintenance, so if you needed the floor cleaned under your
bench, you unhooked everything and rolled it to the wall, in an are that
would be cleaned the following Saturday. I'm not trying to argue with
you, but the system can work well, with proper planning.

We eliminated carts, were possible, but some techs had over 50 pieces
of test equipment on their benches. We were an engineering to order
facility, and priorities could change a couple times a day, if a
customer's plans changed. We also built and tested some base chassis
for stock, for emergency orders. We were able to ship a couple custom
radios within three days, to replace equipment that was damaged at a
customer's site.



--
http://improve-usenet.org/index.html


Use any search engine other than Google till they stop polluting USENET
with porn and junk commercial SPAM

If you have broadband, your ISP may have a NNTP news server included in
your account: http://www.usenettools.net/ISP.htm
.



Relevant Pages

  • Re: Is a USB to GPIB dongle/convertor a difficult project ?
    ... The guy with the floor buffer comes along, ... The maintenance man was a full time day shift employee, ... Most of the carts had so many cables run to the bench that they had to ...
    (sci.electronics.equipment)
  • Re: Is RBT a luddite haven?
    ... I would need to shift back in a minute. ... not when I was riding for performance. ... For myself, I ride to appreciate the beauty of my surroundings, to ... Thus the old equipment suits my ...
    (rec.bicycles.tech)
  • Re: Help! I think this is a simple math problem.
    ... here is where I am getting a bit fuzzy and I know ... I know exactly how many units each shift produces. ... much the equipment is utilized overall. ... I relate that to what each shifts utilization would be. ...
    (sci.math)
  • Re: HLOS - Dont call us well call you.
    ... one shift and 5 days a week, ... In other words, productivity is low, and equipment usage is abysmal. ... I realise that this is because the NHS hasn't got the money to staff ...
    (uk.railway)
  • Re: Is RBT a luddite haven?
    ... I would need to shift back in a minute. ... requirements and those of several friends, very different, and then ... For myself, I ride to appreciate the beauty of my surroundings, to ... Thus the old equipment suits my ...
    (rec.bicycles.tech)

Loading