Re: Spaceship One stepping-stone or dead-end?

From: Lawrence Gales (larryg_at_u.washington.edu)
Date: 10/03/04


Date: Sun, 3 Oct 2004 00:14:30 -0700


On Sat, 2 Oct 2004, Hop David wrote:

> Date: Sat, 02 Oct 2004 10:32:39 -0700
> From: Hop David <hopspageHATESSPAaMmM@tabletoptelephone.com>
> Newsgroups: sci.space.policy
> Subject: Re: Spaceship One stepping-stone or dead-end?
>
>
>
> Rand Simberg wrote:
>
>> Because, unlike Greg, I actually have experience with aerospace cost
>> analysis. I don't necessarily know what's right, but I damn sure know
>> what's wrong, just as I can confidently say that the earth isn't flat,
>> even if I can't describe its exact shape.
>
> When Greg suggests a 9-fold cost increase between orbital and suborbital is
> off by at least an order of magnitude, you confidently say he's wrong.
>
> Sorry, but given the rocket equation, I don't think an 81 fold increase is as
> wildly ludicrous as a flat earth.
>
> --
> Hop David
> http://clowder.net/hop/index.html
>
>
..............................................................
I hear a lot about how the mach 3 speed of SS1 is so vastly less than the
mach 25 orbital speed that SS1 is a dead-end. However, the Holy Grail of
launch vehicles is a reusable SSTO. While some engineers believe that
such a vehicle is not possible with present technology, others disagree.
But suppose that you could easily and economically transport an SSTO at a
relatively slow speed to an altitute of 10-13 miles and release it at a
few hundred MPH. The consequences would be:

(1) The ground handling operations, infrastructure, and range safety
     provisions would be dramatically simpler and less expensive: from
     0 to high altitude it would differ little from an ordinary aircraft
     flight: no tall vehicle assembly buildings, gantry cranes, flame
     trenches, etc.

(2) The engines would not only be more efficient but would last far
     longer than ground launched engines due to much lower pressures. For
     example the SSME needs *major* overhauls after 1-3 flights compared
     with 40 flights between *minor* overhauls for lower pressure RL-10
     engines, according to Len Cormier. This would dramatically cut
     costs.

(3) The structure would weigh significantly less because slow ascent and
     gentle release would eliminate the need for agressive streamlining
     and would greatly reduce the dynamic loads which in the case of the
     ground launched shuttle would rip it to pieces if it did not throttle
     back its engines

(4) The mass ratio would be reduced form 9.7 for a ground launched SSTO
     using SSME engines (ISP average = 425), to 6.7-7.1 for existing
     RL-10 engines, depending on the particular model. A huge reduction

(5) The required minimum size is reduced from about 400 tons for ground
     launch to about 80 tons -- thus the initial development cost can be
     far less

(6) The re-entry heat load is far easier to handle than the shuttle
     because it is a very low density vehicle and enters high in the
     atmosphere as opposed to the shuttle which is very dense (no empty
     tanks) and enters low in the atmosphere

(7) Its low density makes it a much better flyer than the shuttle (the
     flying brick)

(8) It would land at less than 70 MPH compared with the 220 MPH of the
     shuttle, making it far safer, less expensive, and lighter

So we see that a high altitude air launch would dramatically reduce the
costs and simplify the develpment of an (assisted) SSTO.

Now all we need is someone to develop a method of slowly transporting
a rocket to a high altitude and releasing it at a few hundred mph. Oh,
wait, that is almost exactly what Rutan's SS1 has done.

   --- Larry



Relevant Pages

  • Re: Google Cindy Sheehan (was: Re: Peace Mom)
    ... >>> scrapped as part of a cost cutting move. ... An expanding nozzle or better ... > improve the overall performance of the engines. ... > abandoned in one of the many cost-cutting phases of the Shuttle ...
    (misc.writing)
  • Re: Ares vs DIRECT
    ... "Ares III" and the general public will hardly notice. ... The principal difference is the substitution of RS-68 engines for SSMEs on the core stage (as NASA eventually did with the Ares V). ... I eventually discovered a set of the ACI Draft version of the ESAS Report which included the cost figures behind ESAS which was the first crack in the proposal which I found. ... The argument I heard was that the new LV costs needed to match Shuttle thereby providing sufficient work for the existing workforce. ...
    (sci.space.policy)
  • Re: Ares vs DIRECT
    ... "Ares III" and the general public will hardly notice. ... The principal difference is the substitution of RS-68 engines for SSMEs on the core stage (as NASA eventually did with the Ares V). ... ESAS Report which included the cost figures behind ESAS which was the ... Shuttle thereby providing sufficient work for the existing workforce. ...
    (sci.space.policy)
  • Re: Global wireless hotspot
    ... the decision to completely cancel Saturn and go for the Shuttle are ... system using nuclear pulse rockets fueled by cold war weapons. ... You're only counting a fraction of the cost. ... fleet would put up 6,240 metric tons while the Shuttle Fleet puts up ...
    (sci.space.policy)
  • Re: Foam still a key concern for shuttle launch
    ... As of 2004 nasa had budgeted for $2.2 invested in return to flight ... asaps recommended safety upgrades prior to the sts-107 tragedy. ... The accounting item cost in "property damage" alone ... Item Cost STS 107 Space Shuttle $ 1,076,332,029.00 ...
    (sci.space.policy)