Re: Griffin Wants Inline SDLV and 5 Segment SRB/CEV



Scott Lowther <scottlowther@xxxxxxxxxxxxxxxxxxxxxx> wrote in
news:M7Axe.343$j21.231@xxxxxxxxxxxxx:

> Kim Keller wrote:
>
>>>It wouldn't entirely surprise me to see the first qualification
>>>launche of the 5-segment stick booster (no upper stage) by late 2006,
>>>using Pad 39B and the third MLP as infrastructure.
>>
>>There's no way the avionics and the TVC system will be ready for test
>>by then.
>>
> Errrrrmmmm... the TVC system is available *now.*

In two axes (pitch and yaw, or more precisely rock and tilt) only. A single
SRB has no roll control.


--
JRF

Reply-to address spam-proofed - to reply by E-mail,
check "Organization" (I am not assimilated) and
think one step ahead of IBM.
.



Relevant Pages

  • Re: Griffin Wants Inline SDLV and 5 Segment SRB/CEV
    ... >>>It wouldn't entirely surprise me to see the first qualification launche ... >>>and the third MLP as infrastructure. ... >>There's no way the avionics and the TVC system will be ready for test by ...
    (sci.space.policy)
  • Re: Griffin Wants Inline SDLV and 5 Segment SRB/CEV
    ... >>>It wouldn't entirely surprise me to see the first qualification launche of ... >>>and the third MLP as infrastructure. ... >>There's no way the avionics and the TVC system will be ready for test by ...
    (sci.space.policy)

Loading