Re: Griffin Wants Inline SDLV and 5 Segment SRB/CEV



Kim Keller wrote:





It wouldn't entirely surprise me to see the first qualification launche of
the 5-segment stick booster (no upper stage) by late 2006, using Pad 39B
and the third MLP as infrastructure.



There's no way the avionics and the TVC system will be ready for test by then.


Errrrrmmmm... the TVC system is available *now.* However, the likelihood of another 5-segment test by the end of 2006 is... really low. Much less a *flight.*


-- "The only thing that galls me about someone burning the American flag is how unoriginal it is. I mean if you're going to pull the Freedom-of-speech card, don't be a hack, come up with something interesting. Fashion Old Glory into a wisecracking puppet and blister the system with a scathing ventriloquism act, or better yet, drape the flag over your head and desecrate it with a large caliber bullet hole." Dennis Miller .