Re: Air Force Signs Off on SRB-CEV
- From: gherbert@xxxxxxxxx (George William Herbert)
- Date: Sat, 20 Aug 2005 23:51:24 -0000
Rand Simberg <simberg.interglobal@xxxxxxxxx> wrote:
>gherbert@xxxxxxxxx (George William Herbert) glowed:
>>> Either approach would be many, many
>>>billions of dollars cheaper over the life of the
>>>programs than keeping duplicate production lines
>>>open.
>>
>>The point of this is not to save money,
>>it's to avoid having a standdown of any one
>>system take the whole US capability to launch
>>large sized military payloads away.
>
>As opposed to a standown of Shuttle-derived systems, which will result
>in an inability to get to the moon, and resupply/changeout crew for
>any base existing there. I guess that's OK, though.
Don't look at me, I don't even work there...
-george william herbert
gherbert@xxxxxxxxx
.
- References:
- Air Force Signs Off on SRB-CEV
- From: Ed Kyle
- Re: Air Force Signs Off on SRB-CEV
- From: Ed Kyle
- Re: Air Force Signs Off on SRB-CEV
- From: George William Herbert
- Re: Air Force Signs Off on SRB-CEV
- From: Rand Simberg
- Air Force Signs Off on SRB-CEV
- Prev by Date: Re: Air Force Signs Off on SRB-CEV
- Next by Date: Re: CEV launch - Stick or HLV?
- Previous by thread: Re: Air Force Signs Off on SRB-CEV
- Next by thread: Re: Air Force Signs Off on SRB-CEV
- Index(es):