Re: 10 meter diameter CaLV




"jonathan" <Write@xxxxxxxxxxx> wrote in message
news:ZG55g.25194$MM6.8595@xxxxxxxxxxxxxxxxxxxxxxxxx

"Douglas Holmes" <noholmesdgspam@xxxxxxxxxxx> wrote in message
news:a_25g.1248$6d4.1083@xxxxxxxxxxx

"jonathan" <Write@xxxxxxxxxxx> wrote in message
news:T9V4g.23877$iB2.20649@xxxxxxxxxxxxxxxxxxxxxxxxx

"Douglas Holmes" <noholmesdgspam@xxxxxxxxxxx> wrote in message
news:hpM4g.4908$Un3.783@xxxxxxxxxxx

"Jorge R. Frank" <jrfrank@xxxxxxxxxxx> wrote in message
news:Xns97B462BD1D987jrfrank@xxxxxxxxxxxxxxxxx
"Douglas Holmes" <noholmesdgspam@xxxxxxxxxxx> wrote in
R6I4g.1466$nV4.394@trnddc04:">news:R6I4g.1466$nV4.394@trnddc04:


"Jorge R. Frank" <jrfrank@xxxxxxxxxxx> wrote in message
news:Xns97B3D9276F751jrfrank@xxxxxxxxxxxxxxxxx
"Douglas Holmes" <noholmesdgspam@xxxxxxxxxxx> wrote in
vZz4g.267$c%5.114@trnddc02:">news:vZz4g.267$c%5.114@trnddc02:

Leave it to NASA
If there is an easy way and a hard way they choose the hard way.

All that just so they can have one launch instead of two.

Huh?

They *are* going to have two launches - one CLV and one CaLV.

NASA calls it 1.5 launches.

Regardless of the nomenclature, your objection still makes no sense.

If NASA increases the number of launches they can use:
4 segment solid rockets already in production.
The existing fuel tank.
RL-10 engines for the upper stage also aready in use.

If they stick with the current architecture they need:
NEW 5 segment solid rockets
NEW taller wider fuel tank
NEW upper stage engine.


The first rocket is much easier to design and build then the second.
NASA is choosing the second or the hard way.


If we were to build two new launchers, one for manned and
the other heavy lift /without/ the requirement of a moon mission.
But for earth orbit missions only, what would be the best
design then?



Very interesting question.
To answer that fully I would need more info on what NASA is planning.

Based on the existing space station or a simple follow on:
Most of the modules are only about 12.5 tons docking equipment
would take that up near 20 tons.
No design needed the existing EELVs can handle it.
Although you would probably want to get them to upgrade
the upper stage to two RL-10s.


What about a manned booster?

Based on a 6 man station shared with the Russians

EELVs can easily handle that as well.

A Soyuz only masses a little more then 7 tons for three people.
The smallest EELV the Delta IV medium can lift almost 9 tons to ISS.
With a duel RL-10 it would be over 11 tons to ISS.


.



Relevant Pages

  • Re: Establish demand
    ... the total number of launches, almost 120, and pretending that each ... mission delivered 30 tons to orbit, the cost per pound would be over ... falcon 9 series or a delta IV, that made deliveries for $4000/Kg, but ... Since demonstrably we do not yet have RLV technology, the rational approach indicated that we should first attempt less ambitious variations of existing ELV techniques, for instance, recovery of the first stages, demonstration of cryogenic expendable single stage to orbit, etc. ...
    (sci.space.policy)
  • Re: More info on Constellation/CEV
    ... A Spiral 1 CEV only needs to weigh 6 tons, ... > humans into orbit. ... where establishing a lunar base will involve more landings only. ... The Booster launches the Lunar Module with a delta V of 3,061 m/s, ...
    (sci.space.policy)
  • Re: forming composit space station skin in situ
    ... First problem: Shell strength and mass. ... be about 36-40 tons). ... Third problem: existing rocket payload capacity. ... tons to LEO) or 11 shuttle launches just to get to the stage where you ...
    (sci.space.tech)
  • Re: Orlando Sentinel Says it Has Moon Plan
    ... > From what I gather from the article NASA's aiming at a payload capabillity ... 120 tons isn't needed. ... wants to use SDHLV then best go with the existing hardware as much as ... 80 tons can be provided by two upgraded EELV launches. ...
    (sci.space.policy)
  • Re: EELVs Are A Bad Deal
    ... > out and doing complex building stuff. ... More than two launches, and you have to worry more and more about the ... If you can transfer LOX in orbit with tranferring the whole tank, ... So, if you upgrade both EELvs to 30 tonnes or more to LEO, you can do ...
    (sci.space.policy)