Re: KSC to assemble CEV if Lockheed Martin wins
- From: "Jeff Findley" <jeff.findley@xxxxxxxxxxxxxx>
- Date: Thu, 23 Feb 2006 13:30:41 -0500
"Jorge R. Frank" <jrfrank@xxxxxxxxxxx> wrote in message
news:Xns97735F90AB6FCjrfrank@xxxxxxxxxxxxxxxxx
"ed kyle" <edkyle99@xxxxxxxxxxx> wrote in
news:1140708021.149730.100020@xxxxxxxxxxxxxxxxxxxxxxxxxxxx:
The big unknown is where the manufacturing would occur. There
was some talk of doing CEV construction at Michoud, but that
was before the hurricane.
Michoud is still the frontrunner for the CaLV core stage (which makes
sense
since it's ET-derived), and the CLV second stage (if LockMart wins it).
It's not a coincidence that the CaLV, CLV, and CEV proposals all seem to
keep jobs in the areas that currently have shuttle jobs. Because of this,
I'm extremely skeptical of any "cost savings" when compared to the shuttle
program.
Jeff
--
Remove icky phrase from email address to get a valid address.
.
- Follow-Ups:
- Re: KSC to assemble CEV if Lockheed Martin wins
- From: Brian Thorn
- Re: KSC to assemble CEV if Lockheed Martin wins
- From: ed kyle
- Re: KSC to assemble CEV if Lockheed Martin wins
- References:
- KSC to assemble CEV if Lockheed Martin wins
- From: J3mia03
- Re: KSC to assemble CEV if Lockheed Martin wins
- From: John Doe
- Re: KSC to assemble CEV if Lockheed Martin wins
- From: ed kyle
- Re: KSC to assemble CEV if Lockheed Martin wins
- From: Jorge R. Frank
- KSC to assemble CEV if Lockheed Martin wins
- Prev by Date: Re: KSC to assemble CEV if Lockheed Martin wins
- Next by Date: Re: The foam did not do it
- Previous by thread: Re: KSC to assemble CEV if Lockheed Martin wins
- Next by thread: Re: KSC to assemble CEV if Lockheed Martin wins
- Index(es):